I’ve posted the lower cupboard before, but here we have the (almost) finished hutch attached. I’m going to let the urethane cure for a day or two before I install the glass.
That’s this dining room cupboard project finished. I learned quite a lot with this one.
great work! what did you use as a backer? can’t tell if it’s ply or panels. fantastic!
It’s plywood. The The sides, back, and the door (not drawer) fronts on the lower cabinet are quarter inch walnut veneer ply. There’s some poplar internal to the lower cabinet, the upper cabinet is 100% walnut.
beautiful!